New construction of a daycare center with 7 groups in 86145 Mering, "Am Mühlanger"
Electrical installation work
In Markt Mering, a new daycare center with 7 groups is being built. The building comprises a ground floor, 1st floor as well as a technical structure for the ventilation system. The scope of services includes the electrical installation, the lightning protection system, a fire alarm system according to DIN 0826-2 and a PV system on the roof of the daycare center.
Scope:
Quantity ME Description
1 piece house connection + transducer measuring cabinet
1 piece GHV consisting of 1 field
4 sub-distribution boards (free-standing cabinet)
1 piece kitchen distribution
42 pieces of residual current circuit breakers
258 pcs miniature circuit breakers
575 pieces of collection brackets plastic
200 m cable trays of various sizes
5150 m of cables and wires 3x1.5 to 3x4 sqmm
1600 m of cables and wires 5x1.5 to 5x16 sqmm
105 m cables and wires 4x25/16 to 4x95/50 qmm (halogen-free)
2530 m lines low-voltage 2x2x0.8 to 10x2x0.8 sqmm
4300 m cabling for I&C
5000 m CAT7 line
485 pieces of installation equipment (sockets, switches, etc.)
200 pieces of 8 engine control units sun protection for 29 sun protection motors
320 pieces of general lighting luminaires
1 piece lightning protection system (325 m safety line + 17 safety poles)
35 kWp PV system
3 construction power distributors
950 m Betoneinlegearbeiten (Leerrohre)
1 intercom system (2 door intercoms and 11 reception points)
1 fire alarm system according to DIN 0826-2 (50 signalling devices)
1 nurse call system
1 Piece Network Cabinet