The mission refers to the addition of bef sports, swimming hall with Rehab/spa.
The building is erected with cellars for engineering as well as one floor containing rehab/spa.
In addition, part of the building is erected as two floors containing a spa. Other
Information is clear from drawings.
Building area basement: 648 m
Rehab/spa: 860 m
Upper Technology Room: 107 m
Building area: 648 m