In the course of the energetic modernization of the component [KJF] of the Campus Handwerk of the Hannover Chamber of Crafts in Garbsen, parts of the existing floor in the component [F] are broken off and new cement screed is brought in as a bond.
Execution period: approx. July 2020 to early November 2020.
The advertised services include preparatory and additional work, the introduction of cement screed including film, edge insulation strips, connection to existing areas, expansion of the starboard sole in the area of facade elements
- approx. 330 m
- Approx. 100 m processing of existing screed by means of resinification;
- Close approx. 10 slots in the screed with epoxy resin, 0.12 x 2.50 x 0.12 m
- extend approx. 50 m of sole on facade elements;
- Deliver and install 3 pieces of 1.00 x 1.00 m aluminum shaft covers;
- Processing of floor drain, door frames etc.