Electricity supply

The subject of the order is the supply of electricity in the period from 01/01/2020. until December 31, 2020 up to 3,971 tapping points (PPE) with a total estimated volume (+/- 10%) 89,498.29 MWh, of which:

1) For premises and facilities (Part 1 of the contract) - 75,304.22 MWh - a detailed list of PPE is attached as Annex 1a to the Terms of Reference

2) For the purposes of road lighting and signaling (Part 2 of the contract) - 14.194.07 MWh - a detailed list of PPE is attached as Annex 1b to the Terms of Reference


Supply of electricity to premises and facilities

1. Number of measuring systems accounting for consumed electricity 2,578 pcs.

2. The awarding entity has included a detailed description of the collection points (PPE) in Annex 1a to the ToR.

3. Estimated electricity consumption over the duration of the contract (+/- 10%) 75,304.22 MWh, of which:

Zone I 44,451.44 MWh

Zone II 15,434.18 MWh

Zone III 15,418.60 MWh

The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.

4. The measuring systems with the tariff group B are adapted to the procedure of changing the seller.

5. Deliveries will take place from 01/01/2020. until 31.12.2020, with the proviso that details regarding delivery dates (start and end) in relation to individual collection points are described in Annex 1a to the Terms of Reference, column "Delivery period".


Supply of electricity for the purposes of road lighting and signaling

1. Number of measuring systems accounting for electricity consumed 1.393 pcs.

2. The awarding entity has included a detailed description of the collection points (PPE) in Annex 1b to the Terms of Reference.

3. Estimated electricity consumption over the duration of the contract (+/- 10%) 14,194.07 MWh, of which:

Zone I 3,919.36 MWh

Zone II 10.274.71 MWh

Zone III 0.00 MWh

The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.

4. Deliveries will take place from 01/01/2020. until 31.12.2020, with the proviso that details regarding delivery dates (start and end) in relation to individual collection points are described in Annex 1b to the ToR, column 'Delivery period'.