Architectural, engineering and planning services | Tenderlake

Architectural, engineering and planning services

Contract Value:
EUR 3M - 3M
Notice Type:
Contract Notice
Published Date:
18 November 2019
Closing Date:
16 December 2019
Location(s):
DE929 Region Hannover (DE Germany/DEUTSCHLAND)
Description:
Construction program Nordbahn: General planning services

Flughafen Hannover-Langenhagen GmbH (FHG) intends to renew the runway 09L / 27R (Nordbahn). This renovation covers approximately 2/3 of the total length and the renewal of the lighting systems including their electrical infrastructure. In addition, the drainage of the northern runway and the surrounding areas will be restructured and renewed. The superstructure of the northern runway is made of concrete. The goal is to provide a PCN 85 load capacity so that aircraft can launch and land Code Letter E without restrictions.

The individual construction measures are summarized under the term construction program Nordbahn.

See also section 2.4.

The services to be awarded consist of:

Measure renewal drainage Nordbahn:

- taking over and reviewing the present design planning as special services,

- Work phases 4 to 8 civil engineering works acc. §§ 41 HOAI as optional commission by determination of the AG (possibly in stages to be determined by the client),

- Local construction supervision as a special service,

- Special services in all phases of work Engineering structures acc. §§ 41 HOAI as optional commission by determination of the AG (if applicable, in stages still to be determined by the client).

Renewal of Nordbahn:

- Performance phase 1-3 traffic facilities acc. §§ 45 HOAI,

- Service phases 4 to 8 traffic systems acc. §§ 45 HOAI as optional commission by determination of the AG (possibly in stages to be determined by the client),

- local construction supervision as a special service,

- special services in all phases of transport §§ 45 HOAI as optional commission by determination of the AG (if applicable, in stages still to be determined by the client).

Measure Fillet TWY M / N; Measure renewal TWY G, J, K, K TO:

- taking over and reviewing the present design planning as special services,

- Service phases 4 to 8 traffic systems acc. §§ 45 HOAI as optional commission by determination of the AG (possibly in stages to be determined by the client),

- Local construction supervision as a special service,

- Special services in all phases of transport §§ 45 HOAI as optional commission by determination of the AG (if applicable, in stages still to be determined by the client).

Measure lighting stations Nordbahn; Measure lighting stations Nordbahn; Measure exchange edge fire SLB; Measure operation monitoring system firing; Measure Replacement center line and touchdown fire north run: Measure approach light 09L and 27R:

- Power phase 1-3 Technical equipment (ELT) acc. §§ 53 HOAI ALG 4-5,

- Performance phases 4 to 9 Technical equipment (ELT) acc. §§ 53 HOAI ALG 4-5 as an optional assignment by determination of the AG (if applicable, in stages still to be determined by the client),

- Special services in all phases Technical equipment (ELT) acc. §§ 53 HOAI ALG 4-5 as optional commission by determination of the AG (if applicable, in stages still to be determined by the client).

A detailed description of performance is attached to the annexes.

The contracting entity can be supported and advised in the operative implementation of this SektVO procedure by D & K drost consult GmbH, Hamburg.

Download full details as .pdf
The Buyer:
Flughafen Hannover-Langenhagen GmbH
CPV Code(s):
71240000 - Architectural, engineering and planning services