This consultation concerns the project management mission for the renovation work of the Department's hotel (missions specified in the CCAP)For each tranche, the contract is concluded for a period ranging from the date of commencement of the studies prescribed by the start-up service order until the expiry of the guarantee period of perfect completion. For information, the estimated overall duration of the contract is 48 months (indicative and non-contractual duration). The services are divided into 2 tranches (the part of the estimated financial envelope allocated by the contracting authority to the works for each tranche, all trades, is specified in the Dce). Farm section - Châtelet wing: renovation of the ground floor, R + 1 and R + 2. Sainte-Même wing: renovation of the R+1 and R+2Optional tranche 1 - Sainte-Même wing: renovation of the ground floorthe period for strengthening the optional tranche is 12 months from the notification of the contract
This consultation concerns the project management mission for the renovation work of the Department's hotel (missions specified in the CCAP)For each tranche, the contract is concluded for a period ranging from the date of commencement of the studies prescribed by the start-up service order until the expiry of the guarantee period of perfect completion. For information, the estimated overall duration of the contract is 48 months (indicative and non-contractual duration). The services are divided into 2 tranches (the part of the estimated financial envelope allocated by the contracting authority to the works for each tranche, all trades, is specified in the Dce). Farm section - Châtelet wing: renovation of the ground floor, R + 1 and R + 2. Sainte-Même wing: renovation of the R+1 and R+2Optional tranche 1 - Sainte-Même wing: renovation of the ground floorthe period for strengthening the optional tranche is 12 months from the notification of the contract