Expansion of the Gemeinschaftsschule Korb at the Urbanstraße location - extension of new construction and energy renovation
Total construction costs (KG100-700): 9 423 000 EUR gross
GFA: 2 230 sqm
BRI: 8,800 cbm
Trades: conveyors - elevator
Lift system:
Lift system with ventilation and smoke extraction shaft and with 8 stops EG-3 OG four each for tendering the new building and four for tendering the existing building (varying height levels). The portal entrances of the respective floors are realized with specific wall enclosure frames