earthwork
- Construction pit slope angle 45
- approx. 1 300 m
- approx. 23,000 m
- Dispose of approx. 5,000 t of Z.2 material properly,
- Dispose of approx. 22 500 t of Z.0 material.
Creating a layer of frost
Installation of underground pipe DN 100 to DN 300.
earthwork
- Construction pit slope angle 45
- approx. 1 300 m
- approx. 23,000 m
- Dispose of approx. 5,000 t of Z.2 material properly,
- dispose of approx. 22 500 t of Z.0 material,
Creating a layer of frost
Installation of underground pipe DN 100 to DN 300.