GPA for the executive design and execution of the works for the construction of the new three-track railway tunnel of Monte Virgolo from kilometer 149+100 to kilometer 149+635 of the Verona-Brennero (BD) line, of the new sections of even and odd track of the Verona - Brennero line from kilometer 148+735 to kilometer 149+771 (BD), the extension of the Merano track from kilometre 0+651 to kilometre 1+763, including the new Merano junction, railway superstructures, electric traction systems, mechanical systems and the new technological building (GA01) near kilometre 148+000 of the Verona-Brenner (BD) line.
Amount placed on the basis of the tender Euro 73,167,074.17 net of VAT, of which Euro 6,622,831.20 for charges relating to the implementation of security plans, not subject to reduction.
Validation of the project took place with note prot.
RFI-NEMI. DIN. DINE. VR\VERB\P\2023\0000312 del 23/06/2023
For a timely description of the contract, refer to the content of the subject matter of the agreement scheme attached to the tender specification.
Amounts of the categories of which the work is composed:
OG04 (*) € 23.375.051,00
SQ011 - PLACE-001 € 20.066.252,08
OG03 (*) € 12.513.198,87 of which € 2.305.200,00 for Prescriptions
SQ004 - LAR-003 (*) € 5.093.089,17 of which € 53.000,00 for Prescriptions
OS21 (*) € 7.607.599,40 of which € 2.590.000,00 for Prescriptions
SQ001 - LTE-002 € 3.370.655,12
SQ001 -LTE-004 € 1.568.753,99
OS19 € 386.079,89
OS08 € 323.260,60
OG11 € 319.250,32
OS18-A € 245.635,63
OG01 (*) € 614.884,10 of which € 370.000,00 for Prescriptions
SQ005 -LIS-C € 206.505,81
OS12-B € 166.972,75
OS12-A € 151.574,90
BOE B. TER € 1.172.369,53
WORK AND PERFORMANCE INCLUDED IN THE PREDOMINANT INDICATED ONLY FOR THE PURPOSES OF SUBCONTRACTING
SQ001 - LTE001 for € 132497,59
OS 09 per € 81214,91
OS34 * € 68.000,00 for Prescriptions
(*) it should also be noted that category OG04 is indicated with the prescriptions as it contains those relating to category OS 34 loaded on the prevailing category.
The works to be designed fall, according to the list referred to in DM 17.6.2016 in the following categories:
S.05 € 814.656,41
S.03 € 208.486,88
V.03 € 140.853.27
S.04 € 85.909,04
IB.08 € 44.136,90
IA.04 € 42,251.08
E.02 € 12.923,83
T.02 € 7.818,32
D.04 € 5.615,15
IB.09 € 2.800,16
IA.02 € 5,466.64
P.03 € 1.223,33
Labour costs have been estimated at Euro 15,355,065.18.
The procedure adopted for calculating the compensation for the design and the requirements for participation required to the designers are reported in the Competition Regulation.
The award procedure is called pursuant to Legislative Decree 50/2016 (Public Contracts Code) and Presidential Decree 207/2010 - limited to the rules still in force pursuant to art. 216 of Legislative Decree 50/2016 - for the part applicable to the so-called Special Sectors.