1.The subject of the contract is the development of design documentation for the reconstruction of Tylna Street on the section from Kilińskiego Street to Sienkiewicza Street.
2.The reconstruction covers the entire width of the road lane, including the roadway, greenery, solid vegetation, sidewalks, parking spaces, reconstruction of lighting and armament being in collision designed road system, drainage of the road lane, inventory and green design, selection of urban furniture. The length of the documentation section is about 850 m. Scope according to the attached MPU concept.
3. The order should be carried out in accordance with the detailed description of the subject of the contract contained in Appendix No. 1 to the SWZ – Description of the subject of the contract and on the terms set out in Appendix No. 2 – Draft provisions of the contract.
1.The subject of the contract is the development of design documentation for the reconstruction of Tylna Street on the section from Kilińskiego Street to Sienkiewicza Street.
2.The reconstruction covers the entire width of the road lane, including the roadway, greenery, solid vegetation, sidewalks, parking spaces, reconstruction of lighting and armament being in collision designed road system, drainage of the road lane, inventory and green design, selection of urban furniture. The length of the documentation section is about 850 m. Scope according to the attached MPU concept.
3. The order should be carried out in accordance with the detailed description of the subject of the contract contained in Appendix No. 1 to the SWZ – Description of the subject of the contract and on the terms set out in Appendix No. 2 – Draft provisions of the contract.