construction work for electricity power lines | Tenderlake

construction work for electricity power lines

Contract Value:
GBP 450M - 450M
Notice Type:
Contract Notice
Published Date:
17 July 2012
Closing Date:
26 July 2012
Location(s):
UKM SCOTLAND (UK UNITED KINGDOM)
Description:
Transmission Networks - Electrical Overhead Line Works (New & Refurbishment).

The Contracting Entity, Scottish Hydro Electric Transmission Limited (SHETL) is engaged in the reinforcement and development of its electricity transmission network for the purposes of supporting the expansion of renewable energy generation in the North of Scotland. The existing reinforcement and development programme has an anticipated duration of 8 to 10 years.

Part of this programme of works includes the increase in capacity/reinforcement of its overhead line transmission network. This will involve both an upgrade of some its current transmission network as well as the installation of new transmission lines. It is the intention of SHETL to enter into framework contracts with relevant economic operators to provide these works on its behalf. SHETL reserves the right to award any number of contracts or none at all. The nature of these works includes but is not limited to the detailed design, supply, installation, construction and commissioning or refurbishment of overhead transmission lines across Scotland as required.

Download full details as .pdf
The Buyer:
Scottish Hydro Electric Transmission Limited
CPV Code(s):
45231400 - Construction work for electricity power lines