LOT 1: Heating installation according to DIN 18380 ; LOT 2: Ventilation installation according to DIN 18379; LOT 3: Sanitary installation according to DIN 18 381; LOT 4: Technical thermal insulation according to DIN 18421
Heating installation according to DIN 18 380Type and scope of the service:
- approx. 180 m steel pipe black up to DN 50
-ca. 105 m copper pipeline up to DN 40
-ca. 520 m Radiator connection system, plastic
-ca. 50 socket and flange fittings up to DN 50
- approx. 31 radiators
- 1 piece energy center 3000 liters
- Required fire protection bulkhead in ceilings and walls
Ventilation installationType and scope of the service:
- 1 compact ventilation unit max. 3,700 m³/h
- approx. 12 fire dampers
- approx. 270 m² ventilation duct with moulded parts
- approx. 200 m spiral seam pipe up to d 250
- about 50 pieces. Air inlets and outlets
plumbingType and scope of the service:
-ca. 25 m cast iron sewer pipes
- approx. 210 m plastic sewage pipes
- approx. 540 m drinking water pipe made of stainless steel up to DN 32
-ca. 20 socket fittings up to DN 32
-ca. 42 pieces of sanitary fittings
- Required fire protection bulkhead in ceilings and walls
Technical thermal insulationType and scope of the service:
- approx. 130 m of mineral wool pipe insulation on heating pipes
- Approx. 250 m of rubber pipe insulation on drinking water pipes
- approx. 210 m of mineral wool pipe insulation on hot water pipes
- Approx. 40 m of rubber pipe insulation on rainwater pipes
- approx. 25 m of pipe insulation made of foam glass on rainwater pipes
- approx. 40 m insulation on dirty water pipes
- approx. 180 m² of mineral wool insulation on ventilation ducts
- approx. 170 m of mineral wool insulation on ventilation ducts up to d 250
- approx. 80 m² rubber insulation on ventilation ducts