Description:
FBB - Building Automation MSR

The city of Göttingen intends to renovate the existing, listed outdoor pool on Brauweg and make it more attractive.

All pools are to be fundamentally revised.

This includes the dismantling of all outdoor paving surfaces, the removal of all overflow channels, the removal of the film lining, demolition of the pool heads. The bathing water technology must be largely renewed and partially revised. All basins receive new stainless steel gutters and a new foil lining. The non-swimmer pool West will be converted into a children's pool. The walk-through basins will be demolished and replaced by barrier-free walk-through troughs. The entire bathing water technology is renewed and a new rainwater drainage pipe is laid. The existing large slide, as well as the historic diving tower are to be preserved and protected during the construction project. The existing children's pool will be partially demolished and converted into a dry playground. After completion of the pools, the paving areas will be provided with new coverings and the transitions to the higher sunbathing lawn will be revised in landscape planning. The shore areas of the leine are opened on both sides and integrated into the bathing operation as a nature experience space. The two Leineufer connected with a new play suspension bridge. At the same time, the entrance building is being renovated in accordance with monument regulations. The processes of the two separate construction projects must be coordinated with each other in such a way that no hindrances arise.

Total area of outdoor swimming pool: 17,574 m²

Water surfaces: 2,367.04 m²

Plantings and hedges: 370 m²

Trockenspielplatz: 200 m²

Lawns/lawns: 10,600 m²

Right-sided Leinewiese: 3.600m²

Paved areas: 3.650m²

The construction site access is to be approached from the north via the Brauweg, the middle access road and the roundabout. Parking is available in front of the west wing of the entrance building. To be created The construction site will be reached in an easterly direction via the existing cycle path, where a separation with a construction fence takes place. A secured entrance gate with access scrolls borders the construction site. A construction road and a paved turning circle must be built around the construction site that can be used in oncoming traffic. There is limited storage space on the premises. These can be found in the construction site equipment plan. There will be 4 sanitary containers and 3 office containers to deliver. Construction current construction sign

The property south of the Leine is reached from the sand path and is only available for the work on the construction of the play bridge. The existing bridge is not passable.

The tree population on the site must be protected in accordance with the Göttingen Tree Protection Regulations. Parts of the Leineufer are cleared. All paving surfaces are dismantled and disposed of. The pool piping must be exposed. The circumferential GRP gutters must be removed, the film lining of all pelvic bodies must be removed. The reinforced concrete pool heads are partially demolished by means of concrete cutting. Removed the walk-through basins with standing showers.

The Springergrube will receive scaffolding bridges along the pool walls for dismantling.

The tender for building automation / MSR includes the installation and programming of the necessary modules for measuring and controlling the bathing water technology. This includes the control of the circulation pumps of all pools as well as the attraction pump for the children's pool, the splash water tank level measurement and the control of the surge water tank refill, control of the pool water heating as well as the control of the dosing systems for chlorine, pH correction and flocculation via the measurement and control station provided by the site. The installation of the control cabinets and the wiring outside the control cabinets is carried out on site.

The functional operation of the system consists of two states (automatic and Manuel). For this purpose, two operating panels are provided, one of which is to be located in the technical building and in the pump cellar. The control panels are identical and allow control from both locations. The respective controller is requested via a key switch.

Depending on the model, the individual components of the bathing water technology are controlled via the control system. Among other things, the circulation operation of the two filter systems, the temperature of the pure water and the filter flushing are controlled here.

The water values are measured via the measuring, control and dosing systems that are used in order to then dose the respective chemical of the water. The water level is also measured into the splash water tank via the building management system and automatically added as required via the well and drinking water (replenishment). For this purpose, five level monitors are installed each, which regulate the level for the pump control, the replenishment (for circulation and filter flushing operation) and the overflow of the splash water tanks.