Lüftungsarbeiten 1.BA
Ventilation Installation:
- 2 pieces of air handling units
- 2 pieces of decentralised ventilation units
- 2 individual room fans
- 1 circulating air cooling system
- ca. 56 m Kältemittelleitungen
- approx. 171 m² ventilation ducts and fittings
- approx. 89 m Wickelfalzrohr E 100 bis E 500 mm
- 16 mufflers
- 4 volume flow controllers
- 37 pieces of miscellaneous ventilation grilles
- 2 fire dampers
- approx. 351 m² thermal insulation
- approx. 123 m electric cable
Special features regarding the execution deadlines:
BA 1 Library to central aisle 15.4.2024 to 15.11.2024;
BA 1 Aula 15.08.2024 to 28.02.2025