Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 March 2023
Closing Date:
17 April 2023
Location(s):
DEG04 Suhl, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Conversion and renovation of the state-run regional support centre (Aue-Schule) - Lot 22 - Ventilation technology

Central ventilation technology LOT 22

1 St Lüftungszentralgerät 1.000 m³/h

2 St Lüftungszentralgerät 1.800 m³/h

9 decentralised classroom ventilation units 400 m³/h

5 St Einzelraumlüfter 60-100 m³/h

2 St Rohrventilatoren PPs 800 m³/h

12 St Wetterschutzgitter 400x330 mm

20 pcs silencer 1,000 - 4,600 m³/h

8 pcs fire dampers round/rectangular

18 pcs ventilation grille

1 pcs fire damper control and evaluation module up to 8BSK and 6 KRM

290 m² reg. Air duct

390 m² moulded part to dir. Air duct

110 m spiral duct with fittings DN 100 - DN 450

Thermal insulation

200 m² rubber insulation on moulded and channel parts made of verz. St- Sheet metal

130 m² mineral wool 30 mm to verz. Sheet metal ducts and fittings

Dismantling existing ventilation

1 pcs dismantling roof fan

60 m dismantling PPs pipe NW 100

Ceramic furnace exhaust air

22.5 m pipelines, longitudinally welded up to 250°C NW 80- 100

Chemieraumabluft PPs

95 m air duct round made of PPs NW 80 - 200

Recirculation cooling server/ EDP

3 pcs split air conditioners R32 5kW sensitive

3 pcs environmental protection tubs with insulation base and UK

3 St Winterregelung

60 m pre-insulated CU pipe 6x1,0mm

60 m pre-insulated CU pipe 12x1,0mm

Central ventilation technology LOT 22

1 St Lüftungszentralgerät 1.000 m³/h

2 St Lüftungszentralgerät 1.800 m³/h

9 decentralised classroom ventilation units 400 m³/h

5 St Einzelraumlüfter 60-100 m³/h

2 St Rohrventilatoren PPs 800 m³/h

12 St Wetterschutzgitter 400x330 mm

20 pcs silencer 1,000 - 4,600 m³/h

8 pcs fire dampers round/rectangular

18 pcs ventilation grille

1 pcs fire damper control and evaluation module up to 8BSK and 6 KRM

290 m² reg. Air duct

390 m² moulded part to dir. Air duct

110 m spiral duct with fittings DN 100 - DN 450

Thermal insulation

200 m² rubber insulation on moulded and channel parts made of verz. St- Sheet metal

130 m² mineral wool 30 mm to verz. Sheet metal ducts and fittings

Dismantling existing ventilation

1 pcs dismantling roof fan

60 m dismantling PPs pipe NW 100

Ceramic furnace exhaust air

22.5 m pipelines, longitudinally welded up to 250°C NW 80- 100

Chemieraumabluft PPs

95 m air duct round made of PPs NW 80 - 200

Recirculation cooling server/ EDP

3 pcs split air conditioners R32 5kW sensitive

3 pcs environmental protection tubs with insulation base and UK

3 St Winterregelung

60 m pre-insulated CU pipe 6x1,0mm

60 m pre-insulated CU pipe 12x1,0mm

Download full details as .pdf
The Buyer:
Stadtverwaltung Suhl
CPV Code(s):
45331000 - Heating, ventilation and air-conditioning installation work