009-2019 elementary school Waggum, renovation (plaster work)
Execution in up to 4 construction phases:
- about 400 m 2 Film cover of openings and protective cover with cover film,
- about 1 000 m 2 Clean concrete surfaces,
- About 500 m 2 Burn-up barrier on sand-lime brick,
- about 20 m 2 Plaster adhesive bridge for plaster or plaster lime plaster on concrete surfaces,
- about 50 m 2 Plaster machine plaster Q3, inside wall,
- About 500 m 2 Plaster adhesive bridge for lime-cement plasters on concrete surfaces,
- About 2 080 m 2 Lime cement machine plaster Q3, inside wall,
- about 50 m 2 Slate for creating smooth surfaces,
- about 310 m 2 Interior wall plaster under tiles.
Execution in up to 4 construction phases:
- about 400 m 2 Film cover of openings and protective cover with cover film,
- about 1 000 m 2 Clean concrete surfaces,
- About 500 m 2 Burn-up barrier on sand-lime brick,
- about 20 m 2 Plaster adhesive bridge for plaster or plaster lime plaster on concrete surfaces,
- about 50 m 2 Plaster machine plaster Q3, inside wall,
- About 500 m 2 Plaster adhesive bridge for lime-cement plasters on concrete surfaces,
- About 2 080 m 2 Lime cement machine plaster Q3, inside wall,
- about 50 m 2 Slate for creating smooth surfaces,
- about 310 m 2 Interior wall plaster under tiles
When submitting GAEB files, please submit them in XML format, if possible.