Houses construction work | Tenderlake

Houses construction work

Contract Value:
-
Notice Type:
Contract award notice
Published Date:
04 April 2023
Closing Date:
Location(s):
UKM SCOTLAND (UK UNITED KINGDOM)
UKM64 Eilean Siar (Western Isles) (UK UNITED KINGDOM)
Description:
HHP Investment Works Framework 2023 - 2029

Hebridean Housing Partnership (HHP) is seeking to establish a multi lot, multi supplier framework to deliver its Investment Works programme for 2023 – 2027. HHP intend to appoint up to a maximum five contractors per Lot of the framework.

The framework geographical delivery locations are: Lewis, Harris, Uists and Barra.

The framework covers the following types of work across 18 lots:

- Windows & Doors

- Heating

- Bathrooms

- Kitchens

- Roofing & Roughcast

- Electrical

- Environmental

- Occupational Therapy

- Energy Efficiency


Windows & Door Replacement - Lewis & Harris

Covers the replacement of window, doors, roof windows and store doors etc.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period.


Heating Replacement - Uists & Barra

Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system.

Scope includes:

-Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Bathroom Replacement - Uists & Barra

Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Kitchen Replacement - Uists & Barra

Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install- Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period.


Roofing & Roughcast Works - Uists & Barra

Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt).

Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced.

Fencing covers for new low level timber palisade fencing.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install- Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Electrical Works - Uists & Barra

Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Environmental Works - Uists and Barra

Covers the installation of fencing, footpaths and drainage works to properties Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Occupational Therapy Works - Uists & Barra

Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Energy Efficiency Works - All Areas

Covers the upgrading of insulation to walls and roofs and all associated work to properties.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Bathroom, Kitchen & Heating Installation Works - All Areas

Covers larger programmes of work in relation to installation of bathrooms, kitchens and heating replacements. Programmes will not necessarily cover all three elements and may be restricted to a single element as applicable.


Heating Replacement Works - Lewis & Harris

Covers the removal of existing heating system (either solid fuel or electric storage/ convector) and subsequent replacement with Air Source Heat Pump heating, hot water and distribution system.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment - including 3 visits to each tenant to train them in the understanding of the heating system

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Bathroom Replacement Works - Lewis & Harris

Covers the replacement of sanitary ware, installation of new over-bath shower with water-proof tile effect panels around bath, new consumer unit (if required), replacement of light fitting, decoration to walls and ceiling, new extractor fan and replacement of floor covering.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period.


Kitchen Replacement - Lewis & Harris

Covers the replacement of kitchen units to new layout, accommodation of all white goods, new electrical sockets and switches, replacement of wall and ceiling coverings/ paint and replacement of vinyl flooring. Tenant chooses kitchen units, worktops, wallpaper or paint and vinyl.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified - Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install- Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period.


Roofing & Roughcast Works - Lewis & Harris

Covers the removal of existing roof covering, battens, counter battens, gutters, lead and fascias and their subsequent replacement to HHP specification (incl. new felt).

Roughcast covers the power-washing to existing walls. New roughcast to be applied over existing with existing drip-checks retained. Any skews and wall copes to be replaced.

Fencing covers for new low level timber palisade fencing.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install- Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Electrical Works - Lewis & Harris

Covers the first time installation of external bulkhead light fittings, replacement of carbon monoxide detectors and smoke detectors, partial house re-wire and full house re-wire.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Environmental Works - Lewis & Harris

Covers the installation of fencing, footpaths and drainage works to properties Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Occupational Therapy Works - Lewis & Harris

Covers the installation of showers, ramps, grab rails, stair lifts and the like for the disabled along with all associated work to properties Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period


Window & Door Replacement - Uists & Barra

Covers the replacement of window, doors, roof windows and store doors etc.

Scope includes:

- Survey - Coordinate and undertake survey at site minimising disruption and inconvenience to tenants

- Design - Design and agree installations (where appropriate) to HHP specifications, standards and with the tenant where specified

- Procure & Supply - Procure to HHP standards, specifications and or agreed equivalents

- Install - Install and make good as appropriate

- Commissioning - Commission any new equipment

- Defects & Maintenance - Manage and make good any defects and undertake maintenance of any required equipment within the specified 52 week period

Awarded to:
Electrical Works - Lewis & Harris
A Campbell Electrical Services Ltd, Stornoway (UK)
Occupational Therapy Works - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Bathroom, Kitchen & Heating Installation Works - All Areas
Alex Murray Construction Ltd, Stornoway (UK)
Heating Replacement Works - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Bathroom Replacement Works - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Kitchen Replacement - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Electrical Works - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Environmental Works - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Occupational Therapy Works - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Window & Door Replacement - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Windows & Door Replacement - Lewis & Harris
Alex Murray Construction Ltd, Stornoway (UK)
Heating Replacement - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Bathroom Replacement - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Kitchen Replacement - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Roofing & Roughcast Works - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Electrical Works - Uists & Barra
Alex Murray Construction Ltd, Stornoway (UK)
Environmental Works - Uists and Barra
Alex Murray Construction Ltd, Stornoway (UK)
Energy Efficiency Works - All Areas
Alex Murray Construction Ltd, Stornoway (UK)
Occupational Therapy Works - Uists & Barra
FES FM LTD, Stornoway (UK)
Bathroom, Kitchen & Heating Installation Works - All Areas
FES FM LTD, Stornoway (UK)
Heating Replacement Works - Lewis & Harris
FES FM LTD, Stornoway (UK)
Bathroom Replacement Works - Lewis & Harris
FES FM LTD, Stornoway (UK)
Roofing & Roughcast Works - Lewis & Harris
FES FM LTD, Stornoway (UK)
Kitchen Replacement - Lewis & Harris
FES FM LTD, Stornoway (UK)
Electrical Works - Lewis & Harris
FES FM LTD, Stornoway (UK)
Environmental Works - Lewis & Harris
FES FM LTD, Stornoway (UK)
Occupational Therapy Works - Lewis & Harris
FES FM LTD, Stornoway (UK)
Window & Door Replacement - Uists & Barra
FES FM LTD, Stornoway (UK)
Windows & Door Replacement - Lewis & Harris
FES FM LTD, Stornoway (UK)
Heating Replacement - Uists & Barra
FES FM LTD, Stornoway (UK)
Bathroom Replacement - Uists & Barra
FES FM LTD, Stornoway (UK)
Kitchen Replacement - Uists & Barra
FES FM LTD, Stornoway (UK)
Electrical Works - Uists & Barra
FES FM LTD, Stornoway (UK)
Environmental Works - Uists and Barra
FES FM LTD, Stornoway (UK)
Roofing & Roughcast Works - Lewis & Harris
Neil MacKay Co Ltd, Western Isles (UK)
Windows & Door Replacement - Lewis & Harris
Neil MacKay Co Ltd, Western Isles (UK)
Bathroom Replacement Works - Lewis & Harris
O'Mac Construction Ltd, Stornoway (UK)
Kitchen Replacement - Lewis & Harris
O'Mac Construction Ltd, Stornoway (UK)
Download full details as .pdf
The Buyer:
Hebridean Housing Partnership Ltd
CPV Code(s):
31680000 - Electrical supplies and accessories
31681000 - Electrical accessories
31681400 - Electrical components
31681410 - Electrical materials
34928200 - Fences
34928220 - Fencing components
34953000 - Access ramps
39141000 - Kitchen furniture and equipment
39141400 - Fitted kitchens
39715200 - Heating equipment
39715210 - Central-heating equipment
42131110 - Central-heating radiator valves
44112400 - Roof
44112410 - Roof frames
44112420 - Roof supports
44112500 - Roofing materials
44115200 - Plumbing and heating materials
44115210 - Plumbing materials
44115220 - Heating materials
44115600 - Stairlifts
44221000 - Windows, doors and related items
44221100 - Windows
44221110 - Window frames
44221200 - Doors
44221211 - Door frames
44221213 - Door thresholds
44221220 - Fire doors
44411200 - Baths
44411400 - Shower basins
44620000 - Central-heating radiators and boilers and parts
44621110 - Central-heating radiators
44621220 - Central-heating boilers
45111240 - Ground-drainage work
45210000 - Building construction work
45211300 - Houses construction work
45211310 - Bathrooms construction work
45232141 - Heating works
45233161 - Footpath construction work
45233253 - Surface work for footpaths
45233340 - Foundation work for footpaths
45260000 - Roof works and other special trade construction works
45261200 - Roof-covering and roof-painting work
45261210 - Roof-covering work
45261211 - Roof-tiling work
45261212 - Roof-slating work
45261410 - Roof insulation work
45261420 - Waterproofing work
45262522 - Masonry work
45310000 - Electrical installation work
45311000 - Electrical wiring and fitting work
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45315000 - Electrical installation work of heating and other electrical building-equipment
45317000 - Other electrical installation work
45320000 - Insulation work
45321000 - Thermal insulation work
45330000 - Plumbing and sanitary works
45331000 - Heating, ventilation and air-conditioning installation work
45331100 - Central-heating installation work
45332200 - Water plumbing work
45342000 - Erection of fencing
45421100 - Installation of doors and windows and related components
45421110 - Installation of door and window frames
45421111 - Installation of door frames
45421112 - Installation of window frames
45421130 - Installation of doors and windows
45421131 - Installation of doors
45421132 - Installation of windows
45421151 - Installation of fitted kitchens