The purpose of this consultation is to conclude a set of public works contracts for the completion of an internal restructuring operation of the “Ponant 1” building.
Structural work demolitionsThe works include in general and not limited to:
- demolition and removal of various structures (lining, partition, floor, etc.),
- openings with or without underpinning,
- opening sentences,
- core samples,
- lean concrete fillings,
- work in staggered hours,
- the various works prescribed in this document.
LocksmithThe work of this lot generally includes:
- revision of existing structures,
- anti-corrosion treatment,
- adaptation and extension of handrails,
- the guide bar on the ground,
- the removal of the elements to be replaced,
- glass assemblies and doors,
- the various according to description.
JoineryThe work of this lot includes the supply and installation, in general, of:
- removal of existing doors,
- laminated interior doors, plain and fire-rated,
- facades and fittings of cupboards, furniture,
- work plans,
- facades of technical ducts,
- wooden cladding panels,
- the various recoveries, fittings, adaptation of existing wooden elements,
- inspection hatches,
- baseboards,
- various according to description.
Dry walls - demountable partitions - ceilingsThe work of this lot generally includes:
- preparatory work (removal, demolition, recovery, opening modifications, etc.),
- thermal linings,
- fixed and removable plaster partitions,
- false ceilings,
- folding blinds,
- various works described in this document.
Soft floors - Hard floors - EarthenwareThe work of this lot generally includes:
- leveling compounds,
- carpets and rugs,
- flexible PVC floors,
- tiled floors,
- earthenware,
- commissioning cleaning,
- various according to description.
Sanitary plumbing - HVACThe maintenance, upkeep and testing of installation and equipment, plumbing, sanitation, etc.
Electricity - strong current - weak currentThe work of this lot aims to define the necessary works concerning the installations:
- normal lighting,
- security lighting,
- household power sockets,
- office workstation,
- the fire safety system.
The work to be performed by the contractor will include: supply, transport to the site, installation and adjustment of all devices and components (even if they are not expressly provided for in this document ) which will be necessary for the complete installation in accordance with the rules of the art and in such a way that there are no omissions.
Painting finishesThe work of this lot includes the supply and installation, in general, of:
- the protection of existing floors and structures,
- the preparations,
- ceiling paintings,
- the paintings of the interior walls,
- painting of woodwork and interior metalwork,
- cleaning of the canopy,
- various according to description.