This list of services includes the services for the redesign of the outdoor facilities in the spa park area of the sensory garden. Landscaping, civil engineering and path construction work must be carried out for the creation of the outdoor facilities.
earthworks:
- 50 m
- 1,000 m
- 250 m
- 250 m
- 800 m
- 500 m
- 72 m
Road construction work:
- 140 m
- 160 m
- 25 m
- make 170 m of edging from steel strip 6/100 mm,
- Make a 56 m edging of 8/25/100 cm concrete skirting board.
Metallbauarbeiten:
- deliver and install approx. 15 m fence segments made of bar mesh, powder-coated,
- Delivery and installation of approx. 13 m parapet railing made of flat steel and round tube, powder-coated,
- Delivery and installation of approx. 37 m flat steel handrail, powder-coated.
Walls:
- approx. 160 m dry stone wall made of natural stone,
- Approx. 90 m supporting angle wall made of precast concrete parts, height up to 235 cm,
- Approx. 16 m in-situ concrete wall with 3 support pillars.
stairs:
- 3 step systems with widths of 200-350 cm (2 x with 6 steps, 1x with 13 steps).
Drainage:
- deliver and install approx. 13 m drainage channel,
- 1 piece of street gully, delivery and installation of the desk form,
- 15 m plastic pipe DN110 delivery and installation,
- Deliver and install 30 m plastic pipe DN110.
Internals:
- Pick up and install 2 waste bins from Bauhof AG,
- Pick up 4 pieces of bench from Bauhof AG and install them,
- Deliver and install 8 pieces of grating 500 x 1000 mm as scratch protection,
- approx. 4 m
Vegetation areas:
- 130 m
- 100 m
- 6 pcs of new trees (plants provided by the customer) including completion maintenance.
Demolition:
- 200 m
- 110 m
- 50 m
- Break off 100 m curb stones and dispose of them,
- 53 m
- 16 m
- Break off the 13 m handrail and dispose of it,
- 150 m
- Break off and dispose of 20 m drainage channels,
- Dismantle the 5 m wire mesh fence and transport it to the Bauhof AG,
- Dismantle 1 gate system and transport it to Bauhof AG,
- Dismantle 1 swing gate and transport it to Bauhof AG.