Construction project: renovation of the primary and secondary school Tann, Gewerk: façade works
- approx. 200 m² metal substructure
- approx. 390 m of joint filing of all vertical and horizontal joints
- approx. 200 m² fiber cement façade panels stairwell lining
- approx. 360 m² wooden support slattening on wooden frame surface
- approx. 360 m² additional expenditure on substructure in the building area
- approx. 170 m façade finish made of aluminium ventilation profile
- approx. 360 m² wind seal with façade sheeting
- approx. 170 m attic cover with aluminum sheet
- approx. 360 m² fiber cement façade panels roof truss cladding
- approx. 100 m² roof edge attic with insulation