Gerüstbauarbeiten
The complex, which consists of a total of 3 buildings, was built between the
Built in the 1960s and 1980s as the Federal Plant Variety Office and until about 10 years ago
years.
In the future, the buildings will be used as part of Bamberg's service operations in
mainly include areas of the horticultural department and road maintenance.
The building plot is located on the southern outskirts of the city, east of the Main-Danube Canal. In terms of traffic, the property is accessible within the village through the completely paved local road "Am Sendelbach", the supra-regional connection is via the north-south connection BAB A73 Nuremberg - Suhl
given. The access road to the property leads, starting from the "Sendelbach",
via an approx. 100 m long, approx. 3 m wide, paved private road to the
Building site.
The building is constructed in solid construction mainly as masonry components, the ceilings in reinforced concrete as ribbed and flat slabs.
Building A consists of a 2-storey main building with a full basement
as well as a ground-floor side wing on the south side
with crawl space.
Components B and C are connected to each other in the southwestern corner area via a small, approx. 20 m2 intermediate building in the attic
All buildings are designed with tiled gable roofs in beaver tail covering, the horizontal roof trusses are made as carpenter's wooden constructions with collar beams.