The subject of the order is the reconstruction of the district heating network Dn300, Dn250, Dn200, Dn150, Dn50, Dn32 along Ku Słoiec Street, Tenisowa from the K14 chamber in Ku Słoiec Street to the preinsulated network in Tenisowa Street, which includes:
1) Part I — conversion of the thermal network of traditional ducted high parameters into a pre-insulated network;
2. Part II — construction of teletechnical sewerage without fibre on the route of the district heating network being rebuilt under this order, from point t1 to point t158 in accordance with the technical documentation of Annexes 2 to TSPACW.
The subject of the order is the reconstruction of the district heating network Dn300, Dn250, Dn200, Dn150, Dn50, Dn32 along Ku Słoiec Street, Tenisowa from the K14 chamber in Ku Słoiec Street to the preinsulated network in Tenisowa Street, which includes:
1) Part I — conversion of the heat network of traditional ducted high parameters into a pre-insulated network according to the following statement:
(a) from point C1a/C1b to point C37.1a/C37.1b in preinsulated tube technology 2 x Dn300 mm (2 x Dz323,9/500) with length L = 2 x 650 m;
(b) from point C9a/C9b to point 3/4 of preinsulated pipe technology 2 x Dn80 mm (2 x Dz88,9/180) with length L = 2 x 17 m;
(c) from point C37.1a/C37.1b to point W5/W6 in preinsulated tube technology 2 x Dn150 mm (2 x Dz168,3/ 280) with length L = 2 x 65 m;
(d) from point C37.1a/C37.1b to point C65a/C65b in preinsulated tube technology 2 x Dn250 mm (2 x Dz273/450) with length L = 2 x 465 m;
(e) from point C65a/C65b to point C105a/C105b in preinsulated tube technology 2 x Dn200 mm (2 x Dz219,1/355) with length L = 2 x 874 m;
(f) 6) from point G/H to point 5/6 in preinsulated pipe technology 2 x Dn150 mm (2xDz168,3/ 280) with length L = 2 x 21 m;
g) from point L/L to point 8/7 in preinsulated pipe technology 2 x Dn50 mm (2 x Dz60,3/140) with length L = 2 x 12 m;
h) from point K/M to point 9/10 in the technology of 2 x Dn50 mm (2 x Dz60,3/140) with length L = 2 x 4 m.
L inch = 2 x 2108 m
2) Part II — construction of teletechnical sewerage without fiber on the route of the district heating network, from point t1 to point t158.
The route length of the teletechnical sewerage section is approximately L = 2 100 m. In addition, the construction of 13 cable wells of SKR-1 and SKR-2 are provided, according to the technical documentation of Annex 2 to the TSPACW.