Reinforced-concrete work | Tenderlake

Reinforced-concrete work

Contract Value:
EUR 50M - 50M
Notice Type:
Contract Notice
Published Date:
04 March 2020
Closing Date:
22 April 2020
Location(s):
DE224 Deggendorf (DE Germany/DEUTSCHLAND)
Description:
Danube expansion Straubing-Vilshofen, section 1: Straubing-Deggendorf, flood protection Polder Steinkirchen part 2, VE321 - civil engineering work Siel Saubach u. BAB A3 embankment

The aim of the measures is to improve the flood protection of the existing settlements and commercial areas in the Steinkirchen polder from the current protection level at around HQ30 to a protection level HQ100.

Siel Saubach

- Creation of the temporary belly diversion of the Saubach (approx. 70 m);

- Construction of the construction pit for the Sielbauwerk including the Bach diversion channel (sheet piling approx. 1 750 m 2 , Earthworks approx. 2,000 m 3 );

- New construction of the Siel building with connection to the existing motorway access (reinforced concrete work approx. 300 m 3 );

- Production of a dam fill (earthwork approx. 6 500 m 3 );

- Sealing measures (extension of drainage path) of the motorway embankment over a length of approx. 125 m. (Sheet piling approx. 1,000 m 2 );

- Surface work (paths, drainage ditches, pipe culverts) in the area of the Siels to a small extent;

Slope foot protection BAB A3

- clearing work on the rootstocks on the motorway embankment (approx. 370 units);

- Soil removal and production of a filter layer made of gravel material at the foot of the freeway (earthworks approx. 8 500 m 3 );

- Establishment of an entertainment path along the highway embankment over a length of approx. 1,120 m (path work approx. 4,000 m 2 ).

Download full details as .pdf
The Buyer:
Bundesrepublik Deutschland und Freistaat Bayern, letztlich vertreten durch die RMD Wasserstraßen GmbH
CPV Code(s):
45112000 - Excavating and earthmoving work
45262212 - Trench sheeting work
45262310 - Reinforced-concrete work