Vejle Sewage aims to reduce the discharge of uncleaned sewage to the city's recipients, including Vejle Fjord, from the overflow builders on the communal sewer.
To achieve this, Vejle Sewage carries out a wide range of actions related to the existing sewage system, as well as the hydraulic capacity of the Vejle Central Treatment Plant is increased.
As an important part for the reduction of overflow to Vejle Fjord, Vejle Spildevand wants to establish a larger magazine capacity for laced sewage at the Vejle Centralrenseplant. In addition, additional supply line must be established to be established from existing sewer on the west side of Vejle Å to the new tank plant at the treatment plant. These works are included in the task. The task includes total contraction, which includes the design and establishment of 5000 m³ countervailing basin, pumping station, regulation construction works, and wiring, including approximately 425 lbm Ø1400 supply pipeline/pipe basin.
Vejle Sewage A/S aims to reduce the discharge of uncleaned sewage to the city's recipients, including Vejle Fjord, from the overflow builders on the communal sewer.
To achieve this, Vejle Sewage A/S carries out a wide range of actions related to the existing sewage system, as well as the hydraulic capacity of the Vejle Central Treatment Plant is increased.
As an important part for the reduction of overflow to Vejle Fjord, Vejle Spilde water wants to establish a greater magazine capacity for laid-up sewage at the Vejle Centralrenseplant. In addition, additional supply line must be established to be established from existing sewer on the west side of Vejle Å to the new tank plant at the treatment plant.
This offer includes a total contract, which includes the design and establishment of 5000 m³ countervailing basin, pumping station, regulation building works and wiring, including approximately 425 lbm Ø1400 supply pipeline/pipe basin.