The contract mainly comprises:
- Carrying out the necessary grubbing-up works of trees and shrubs in the construction zone;
- Removing hectometer poles, cataphide poles, wildlife screens and guardrails
- Moving vertical signage
- The various preparatory works and earthworks;
- Ensuring water drainage;
- Construction of pools
- Laying foundations and pavements as a foundation pedestal;
- Supplying and installing prefabricated noise barriers including safety bumper
- Performing a pressing
- The installation of various types of road signs (partly reused);
- The layout of the as-built file;
- maintenance of the works during the guarantee period.
Lot 1: Implementing mitigating measures from the ProjectMER of the R6PUBLIC PROCEDURE FOR ADOPTION OF WORKS
Plot 2: Installation of the soundproofing constructions along the R6 thv Kasteellaan/DonkPUBLIC PROCEDURE FOR ADOPTION OF WORKS