Work to renew the existing carriageways between PR 169+300 and PR 179+350 in direction 1 on the A6 motorway
Work to renew the existing carriageways between PR 169+300 and PR 179+350 in direction 1. The work includes the repair of the full-width surface course, the re-laying of the connecting course on certain sections in LCV and RV. As an indication, the main quantities are:- BBSG surface course: 115,000 m²- GB bonding course: 16,000 m²