Architectural, construction, engineering and inspection services | Tenderlake

Architectural, construction, engineering and inspection services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 March 2019
Closing Date:
01 April 2019
Location(s):
DE26B Schweinfurt, Landkreis (DE Germany/DEUTSCHLAND)
Description:

Subject of the contract is the allocation of the technical planning of technical equipment for the rehabilitation and cultivation of the elementary and middle school Sennfeld.

According to current knowledge, the client classifies the technical equipment into the following fee zones: Annex group 4 HZ II, Annex group 5 HZ II and III, Annex group 6 HZ I and Annex group 8 HZ II. The work phases 3-9 for the elementary and middle school are to be commissioned , The commissioning takes place in stages according to §§ 55 and 56 HOAI. The contracting authority decides in the further course of the planning on a further commissioning of the performance levels. From the stepwise commissioning, no demands can be derived on the transfer of further performance levels or other services. The start of service will take place immediately after the order is placed in the summer of 2019.



Technical Equipment, Part 4 Section 2 §§ 53, 55 HOAI Facility groups 4, 5, 6, 8 Work phases 3 to 9. Main usable space 3 180 sqm according to the space program, previously available 2 600 sqm. The building of the elementary school was built in 1936, the middle school in 1970. The "old gymnasium" was built in 1967, followed by the Frankenhalle as multipurpose hall in 1987. After creating an inventory analysis for the entire complex, the elementary and middle schools are to be extended and redeveloped according to the newly established space program According to the findings of the Government of Lower Franconia, there is a considerable need for extension of the primary and secondary school.The reconciliation of the space program with the school's stock plans has shown that 2 600 square meters of main usable space in the existing stock are offset by 3 180 square meters of main usable space in the spatial program Height of 914 square meters in the inventory not proven.There are missing class and group rooms, the teacher area is undersized.However, this is offset by overhangs in the stock of 120 square meters of floor space.

Revise text

Initially, a 3-storey extension is to be built on the existing site, after its commissioning the existing building will be completely refurbished.

The midday care will be moved to an interim building of containers until the end of the measure.

The cost estimates are based on the following investment amounts: AGR 4 approx. 1,026,250 EUR, AGR 5 approx. 400,000 EUR, AGR 6 approx. 50,000 EUR and AGR 8 approx. 190,000 EUR each net. Planned date for the submission of the building permit is 06/2019. The measure should be completed by the beginning of the school year 2021.

Download full details as .pdf
The Buyer:
Gemeinde Sennfeld
CPV Code(s):
71000000 - Architectural, construction, engineering and inspection services