Estricharbeiten.
The following work is planned as part of the construction project:
1st construction phase new building:
- contiguous floor areas of approx. 745 m
- The areas are traversed with electric ants. Therefore increased demands on the screed covering and the TD;
- Installation of separation profiles for acoustic decoupling of the conference areas;
- Screed toilet area with approx. 130 m
2nd stage of construction:
- As a result of demolition of walls, minor repair measures are required in the screed covering.