The work concerns the (re) new construction of building A the Christian Lyceum Veenendaal with a size of approximately 6 500 m2 GFA at the current location of building A of the CLV. A part of the existing structure is hereby retained. The address is Kerkewijk 149 in Veenendaal.
The site on Kerkewijk 149 in Veenendaal already has the right purpose and two buildings on the site remain in use, also during construction.
Overall, the realization phase runs from May 2019 to September 2020.
Lot 1: Structural work6 500 m2
Lot 2: Mechanical installations6 500 m2
Lot 3: Electrotechnical installations6 500 m2