500 m2 of protective flooring
50 m2 floor levelling with special mortar on existing floors
223 m2 Verbundestrich
18 m stainless steel storage bracket
64 pcs Making of recesses in screed and floor, 30/30/9-10 cm
300 m Making slots in screed, 20/5 cm, and resealing
10 m2 screed in small area up to 2 m2, d= 40 mm, demolish
20 m2 screed in small area > 2 to 5 m2, d= 40 mm, demolish
12 t disposal AVV 170107 mixtures of concrete, bricks, tiles and ceramics
Close 32 recesses with mortar, 30/30/10 cm
Close 20 recesses with composite cement screed, 30/30/9-10 cm
Close 16 m recesses with composite cement screed, w= 50 cm, d= 40 mm
Close 35 m wall connections with composite cement screed, w= 20 cm, d= 40 mm