Development of the outdoor sports area.
The works of Lot 1 include all the site facilities for the three lots, various deposits (furniture, panels, ...), the installation of temporary fences to secure the site, demolitions, planing and reprofiling existing spaces, general earthworks in cuttings and embankments for the structures and for the projected green spaces, the realization of trenches for various networks, the evacuation of the cuttings towards the approved centers, the passage of sleeves for the video-protection, for the lighting, the passage of the drinking water network, the creation of the planned sanitation in rainwater, the creation of new structures, the installation of curbs and gutters.
Sports flooring / floor marking / sports equipment.
The supply and installation of street furniture / The supply and installation of fences and gates / The taking back of stock and installation of candelabra / The supply and installation of candelabra / The sizing of lighting blocks / The supply and installation of foundations including earthworks in cuttings / Provision and unwinding of power cable in public lighting / Supply and installation of lighting equipment / Connections / Supply and installation of lighting cabinet / Maintenance of lighting during the whole duration of the work / The realization of control by an approved organization / The tests, measurements and commissioning / The studies and notes of calculation of the structures and the foundations necessary to the realization of the works of this lot / The recovery on stores and Topsoil amendment / Re-profiling of slopes with TV stored on site / Supply and planting of trees / Supply and planting of sod.