The Operation consists of the demolition and reconstruction of a scalable hangar in order to comply with current standards and to be able to accommodate 14 GAZELLE type aircraft and then be used for New Helicopter Training (NHE) type aircraft. Works to be carried out: asbestos removal and demolition of the old hangar 030, building 032 and the concrete slab, adaptation to the site, construction of a new hangar divided into 2 sectors: a main hall with 3 storage/maintenance pedestals and a living/office area, relocation, installation and connections of existing modular structures 0314/195-196, associated works
demolition - earthing - vRDdemolition, asbestos removal, earthworks and roads and highways
Structural work - tCEStructural work, joinery, industrial doors, suspended ceilings, floor and wall coverings
Framing - Cover - CladdingFraming, roofing, cladding, overhead cranes and aircraft doors
Electricity - HVAC - plumbingElectricity, heating, ventilation, air conditioning and plumbing