Engineering services | Tenderlake

Engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
27 June 2022
Closing Date:
10 August 2022
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
KVA Linth 2025, construction manager and local construction management

KVA Linth in Niederurnen recycles up to 116,000 tonnes of municipal and industrial waste every year. It produces

Green electricity, supplies companies and private individuals with heat and recycles metal. The plant has been in existence since 1973 and has been steadily

renewed and modernized. Now another groundbreaking development step is imminent.

The project includes the replacement of the more than 40-year-old furnace line 2 and an extensive upgrading of the furnace line built in 2001

Furnace line 1. The exhaust gas purification systems of both furnace lines are replaced and brought up to the latest state of the art. A new

Turbogruppe takes over the electricity production and the slag will be applied dry in the future. The delivery situation will be

redesigned, for which the existing Zwilag 1 is extended by the Zwilag 2 and connected to the waste bunker. The

In the future, deliveries will be made in the new Zwilag 2 to improve transport logistics.

The project process can be seen in the task description (part D).

KVA Linth in Niederurnen recycles up to 116,000 tonnes of municipal and industrial waste every year. It produces

Green electricity, supplies companies and private individuals with heat and recycles metal. The plant has been in existence since 1973 and has been steadily

renewed and modernized. Now another groundbreaking development step is imminent.

The project includes the replacement of the more than 40-year-old furnace line 2 and an extensive upgrading of the furnace line built in 2001

Furnace line 1. The exhaust gas purification systems of both furnace lines are replaced and brought up to the latest state of the art. A new

Turbogruppe takes over the electricity production and the slag will be applied dry in the future. The delivery situation will be

redesigned, for which the existing Zwilag 1 is extended by the Zwilag 2 and connected to the waste bunker. The

In the future, deliveries will be made in the new Zwilag 2 to improve transport logistics.

The project process can be seen in the task description (part D).

Download full details as .pdf
The Buyer:
KVA Linth
CPV Code(s):
71300000 - Engineering services
71500000 - Construction-related services