The contract shall include optional tranches defined in the specifications. Each lot will be awarded separately. Functional restructuring - energy renovation of the Cité Mixte Charles de Gaulle in Apt composed of several buildings (gymnasium, college, high school, boarding school, half board). Surface of the project plot 54,000 m2 - gross surface area of buildings 26,845 m2 approx
closed covered- Asbestos removal of the premises (Faience glue in 90 square meters, Fiber cement duct approx 101 u).- Complete heavy demolition of building 9 - segpa including interior cleaning of the building (Surface footprint approx 215 square meters).- Structural work: Interior cleaning of the premises (False Ceiling approx 12,392 square meters, Sanitary plumbing and Hvac approx 12,732 square meters, Flexible floor coverings approx 1,852 square meters) - Demolition - Underpinning opening (Rso approx 40 u) - Earthworks - Foundations (Longrines concrete awning approx 142 m3) - various structural works - hard floor coverings (tiles approx 8,650 square meters) and wall (earthenware approx 2,715 square meters)- elevator (1 elevator 630 Kg for Building 6a - gymnasium)- ite - facades (Ite approx 2,950 square meters, Paint approx 6,064 square meters, Cladding fiber cement approx 3,020 square meters).- Metal frame / cover / sealing / sun protection (Metal structure awning approx 50 000 kg, Metal cover approx 1,285 square meters, Expanded metal ceiling approx 1,695 square meters and Sun protection horizontal fixed blades approx 318 u)
Exterior joinery-locksmith- Aluminum exterior joinery (Men Ext: 743 u env - air aerators: 230 u env - air intakes: 132 u approx) - metal doors (Cf 1h: 2 u about / Cf 1/2h: 5 u approximately)- locksmith (guards and external handrail: 126 ml env - ventilation grilles and suction cups: 17 u env - expanded metal panels: 250 square meters env - fence and gate grids: 310 square meters env - motorized gates: 3 u env - metal stairs: 4 u approx)
Second work- Partitions / Lining / False Ceilings (Glued thermal lining: 5,089 square meters approx - Distribution partitions: 9,294 square meters approx - false ceiling: 14,048 square meters approx) - insulation (Flocking : 5 202 square meters approx - blown insulation in attic: 3 142 square meters approx - insulation under slabs by panels: 140 square meters approx) - paint (Ceiling: 3,294 square meters approx - walls: 31,400 square meters env - signposts: 721 u env) - flexible floor coverings (screed: 1,720 square meters env - flocked textile: 630 square meters env - pvc: 1,090 square meters env - pvc baseboards: 1,170 ml approx) - cleaning (18,740 square meters approx) - interior joinery (door blocks: 443 U env - Wooden glass frame: 34 U env - furniture: 182 U approx)
Cooked- Redevelopment of the dishwasher-catering in Building 5 - half board (Removal of existing equipment - laundry equipment (dishwasher, roller tables ...) - extraction hood - insulated panels: 70 square meters approx / Refrigeration equipment - gutters and floor drains in stainless steel) - development work of the Segpa Kitchen in Building 4 - boarding school (Removal of existing equipment - revision and reinstallation of existing equipment recovered - new kitchen equipment - extraction hoods - refrigeration equipment - isothermal panels and joinery: 800 square meters approx - gutters and siphons of stainless steel floors)
Heating / ventilation / plumbing- Heating: Complete renovation of the central boiler room of the site and the Gymnasium - partial renovation of the primary networks: 280 ml env - insulation replacement: 480 ml env - renovation of the substations - renovation of the secondary networks: 7 027 ml env - radiators replaced: 216 u env - revised radiators: 312 u env- ventilation: Cta: 6 u env - rectangular ducts: 12 675 kg approx - circular ducts: 631 ml env - mec Smoke extraction Boarding - plumbing Sanitary : Partial replacement of sanitary appliances including power supplies and evacuations (Wc: 98 u env - washbasins: 64 u approx) - gtc- benches and sorbs: Dry benches: 77 u env - wet benches: 43 u env - Sorbonne: 2 u)
cfo/cfa electricity- Rehabilitation of the strong and weak current networks of the buildings.
- Interior lighting (luminaires: 2,527 u approx) and exterior lighting (luminaires: 255 u approx)
- appareillage Cfo (Pc : 2 864 u env)
- replacement of the Ssi/Sss system (Baes: 317 u env - dm: 94 u env - da: 98 u approx)
- partial renovation of the Vdi network (Access point: 942 u approx)
VRD / green spaces- Vrd: Planing of existing surfaces: 16,776 square meters approx - new coatings (Black asphalt: 16,776 square meters approx - compacted gravel: 1,746 square meters env - synthetic athletics surface: 4,280 square meters approx) - Eu network: 590 ml env - Ep network: 1,355 ml approx - watering network: 650 ml env - outdoor lighting network: 341 ml env - sports equipment (Handball goal: 6 u env - goal Basket Ball: 4 u env) - green spaces: Earthworks: 1 055 m3 env - contribution topsoil: 2 180 m3 env - planting of stem trees: 130 u env - planting of shrubs: 13 365 u env - furniture