The contracting authority require an Architect led Single Point Design Team (SPDT) for the design, procurement, construction and delivery of the Project Opera Contract B works, which includes excavation and construction of the overall basement and construction of the commercial office building, over retail, restaurant/café/bar at ground floor, referred to as parcel 1 at the Project Opera Site. The Project Opera site is a 3.7 acre site located in Limerick City between Rutland Street, Patrick Street, Ellen Street, Michael Street and Bank Place.
The services to be provided include:
• architect (SPDT lead and design certifier);
• civil and structural engineer (specialist transport and roads engineer, resident engineer (if required) and ancillary design certifier);
• mechanical and electrical engineer (ancillary design certifier, low energy building simulation and NZEB compliance);
• façade consulting engineer;
• acoustic engineer; and
• sustainability consultant (LEED).
The contracting authority require an Architect led Single Point Design Team (SPDT) for the design, procurement, construction and delivery of the Project Opera Contract B Works, which includes excavation and construction of the overall basement and construction of the commercial office building, over retail, restaurant/café/bar at ground floor, referred to as parcel 1 at the Project Opera Site. The Project Opera site is a 3.7 acre site located in Limerick City between Rutland Street, Patrick Street, Ellen Street, Michael Street and Bank Place.
The services to be provided include:
• architect (SPDT lead and design certifier);
• Civil and structural engineer (specialist transport and roads engineer, resident engineer (if required) and ancillary design certifier);
• mechanical and electrical engineer (ancillary design certifier, low energy building simulation and NZEB compliance);
• façade consulting engineer;
• acoustic engineer; and
• sustainability consultant (LEED).
Planning permission (reference number ABP-304028-19) has been obtained, however the full SPDT will be required to review the current design to ensure the design is fully coordinated prior to commencing detailed design stage.
The SPDT will be required to complete the detailed design stage in full, with only the technical design being undertaken post novation to the design and build contractor. On award of the design and build contract, the architect led SPDT will be novated to the contractor to act as the design and build contractor’s design team.
Refer to the project information and requirements memorandum and outline project brief for further details on the current status of the overall Project and the services required from the SPDT.