Bath water technology
Paracelsus bath
Roedernallee 200-204
13407 Berlin
In the course of the basic repair of the Paracelsus-Bad, indoor swimming pool in Berlin-Reinickendorf, for the Berliner Bäder-Betriebe, the new construction of the swimming pool technology is the subject of this tender, with the following essential services:
- Bathing water treatment with 2 circuits
- Total circulation capacity 390 m³/h
- three plastic water reservoirs, each with a capacity of approx. 25 m³
- Disinfection chlorine gas
- Backwash water treatment according to DIN 19645 type 3