Lot 3.1 comprises the delivery, assembly, commissioning and documentation of the process engineering components for the thermal plant components of the energy use in the waste incineration plant, in particular consisting of:
- a complete steam distribution system for HD and ND steam
- the integration of the steam turbine TG (lot 3.2) and the air-cooled condenser (lot 3.3)
- the adaptation of the existing feed water system, incl. a pump group for the new furnace line 2
- a complete condensate system, incl. integration of an existing main condensate tank
- a complete cooling water system
Lot 3.1 comprises the delivery, assembly, commissioning and documentation of the process engineering components for the thermal plant components of the energy use in the waste incineration plant, in particular consisting of:
- a complete steam distribution system for HD and ND steam
- the integration of the steam turbine TG (lot 3.2) and the air-cooled condenser (lot 3.3)
- the adaptation of the existing feed water system, incl. a pump group for the new furnace line 2
- a complete condensate system, incl. integration of an existing main condensate tank
- a complete cooling water system