The school on Windberg in Zwickau is a 4-course primary school without after-school care.
The school building is a multi-storey building from 1975 in prefabricated construction with a flat roof.
The focus of the measure is the energy-efficient renovation of the building envelope, facade, windows including shading and the exterior doors.
The planning services to be provided for this are advertised in 4 lots.
building designLot 1 Building planning/heat protection/fire protection/sound insulation
The focus of the measure is the energy-efficient renovation of the building envelope, facade,
Windows including shading and external doors.
In the basement area in the rooms for technical use,
moisture damage to the walls is recognizable and professionally rehabilitated.
As part of the measure, changes are made by the user on the 1st floor,
merging rooms to enlarge the former video room and
the teachers' room, enlargement of the dining room on the ground floor as well as the conversion
of the storage room “Theaterfundus” to the group room.
As a result, it is necessary to adapt the fire protection concept.
In the course of the renovation, the sound insulation requirements for the classrooms are
and corridors in accordance with DIN 18041 audibility and plan
to edit.
Outdoor system planningLot 2 outdoor spaces
In order to improve the quality of stay, the outdoor areas around the building need to be revised in terms of planning. In addition to creating spaces for movement and retreat, learning stimulating open spaces are to be created. The outdoor design should offer a wide range of incentives and opportunities for movement.
- Checking the drainage situation
- Verification of existing play equipment
Technical equipment HLSLot 3 Technical equipment HLS (heating, ventilation, sanitation)
The aim of the energy technology refurbishment should be to improve consumer circles for
refurbish heat and cold supply from the heat/cooling meter
or to manufacture. District heating is primarily available for heat supply.
For cooling, cooling energy is generated by an air-water heat pump
provided. If required, this is suitable for individual selected rooms with
system, such as circulating air cooling units, ceiling cooling or
combined heating and cooling units.
A further goal is the renovation of the sanitary facilities and the associated
ventilation system. The decentralized hot water supply is to be maintained.
Technical equipment ELTLot 4 Technical equipment ELT (electrical engineering)
The energetic refurbishment of the electrical installation includes the lighting system. Furthermore, the fire protection upgrade of all technical systems is a major renovation goal.