Electrical installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 October 2020
Closing Date:
03 November 2020
Location(s):
DE11 Stuttgart (DE Germany/DEUTSCHLAND)
Description:
Fraunhofer IPA Stuttgart - New building component U - V_017_750050_42_Elektro

- 1 medium voltage switchgear / 2 cast resin transformers;

- 1 modular UPS system;

- 1 main low-voltage distribution board;

- 1 energy data acquisition;

- 17 St. UV (AV network / UPS network);

- 75 m busbar / 2 busbar connections NSHV transformer;

- 1 350 m cable trays, vertical cables;

- approx. 2,000 m of laying systems;

- 400 m underground sewer systems;

- 1,000 installation devices;

- 1 KNX installation bus system;

- 2 RWA control centers and operation;

- 300 fire and acoustic barriers;

- 720 pcs of lighting fixtures;

- 1 central battery system;

- 225 emergency lights;

- 1 lightning protection system, earthing and equipotential bonding;

- 1b intercom;

- 1 emergency call system for the disabled;

- 1 BOS building radio system;

- 1 BMA with approx. 325 detectors, 5 RAS systems, acoustic alarms, integration;

- 1 pc. EBM doors / windows EG;

- 1 outdoor video surveillance system;

- 1 access control 15 online readers, central technology;

- 1 struc. Cabling (EDP) 540 connections;

- Line systems for heavy current / low current / media .;

- fiber optic connections BT, outdoor lighting;

- barrier system

"—— Dates for performing the main service on the construction site:

Start of service February 8th, 2021; End of service February 16, 2022

—— Description of the procurement:

- 1 medium voltage switchgear / 2 cast resin transformers 630 kVA;

- 1 pc. Modular UPS system 120 kVA with switch cabinet / UPS distribution;

- 1 pc low-voltage main distribution (3xLS field, 3x outgoing field, ZEP)

- 1 pc of energy data acquisition (meter cabinet, network analyzers, meters);

- 17 St. UV (AV network / UPS network);

- approx. 75 m busbar factory hall / 2 pc. Busbar connection NSHV transformer;

- approx. 1,350 m of cable trays and risers (E0 / E30);

- approx. 2,000 m of installation systems (BR / LF ducts, installation pipes, etc.);

- approx. 400 m underground sewer systems;

- approx. 1,000 installation devices (sockets, etc.);

- 1 pc KNX installation bus system (sun protection / general areas / central);

- 2 pcs SHE centers and operation (without drives);

- approx. 300 fire and acoustic barriers;

- approx. 720 lighting fixtures;

- 1 central battery system approx. 225 safety lights;

- 1 pc lightning protection system approx. 560 m air-termination lines and Interception rods;

- 1 pc of earthing and equipotential bonding for the entire building;

- 1 pc intercom (main entrance / barrier system);

- 1 pc. Handicapped emergency call system;

- 1 pc. BOS building radio system with control panel at the gate;

- 1 pc fire alarm system full protection with approx. 325 detectors, 5 RAS systems, acoustic alarm and integration in best. Central ring;

- 1 burglar alarm system for doors / windows on the ground floor;

- 1 pc video surveillance system outside;

- 1 hour access control approx. 15 online readers and central technology;

- 1 pc. Cabling (EDP) approx. 540 connections;

- Line systems high voltage (E0 / E30) / low current / media technology / outside;

- fiber optic connections components;

- outdoor lighting;

- barrier system ".

Download full details as .pdf
The Buyer:
Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V.
CPV Code(s):
45310000 - Electrical installation work
45311200 - Electrical fitting work
45312310 - Lightning-protection works