- 1 medium voltage switchgear / 2 cast resin transformers;
- 1 modular UPS system;
- 1 main low-voltage distribution board;
- 1 energy data acquisition;
- 17 St. UV (AV network / UPS network);
- 75 m busbar / 2 busbar connections NSHV transformer;
- 1 350 m cable trays, vertical cables;
- approx. 2,000 m of laying systems;
- 400 m underground sewer systems;
- 1,000 installation devices;
- 1 KNX installation bus system;
- 2 RWA control centers and operation;
- 300 fire and acoustic barriers;
- 720 pcs of lighting fixtures;
- 1 central battery system;
- 225 emergency lights;
- 1 lightning protection system, earthing and equipotential bonding;
- 1b intercom;
- 1 emergency call system for the disabled;
- 1 BOS building radio system;
- 1 BMA with approx. 325 detectors, 5 RAS systems, acoustic alarms, integration;
- 1 pc. EBM doors / windows EG;
- 1 outdoor video surveillance system;
- 1 access control 15 online readers, central technology;
- 1 struc. Cabling (EDP) 540 connections;
- Line systems for heavy current / low current / media .;
- fiber optic connections BT, outdoor lighting;
- barrier system
"—— Dates for performing the main service on the construction site:
Start of service February 8th, 2021; End of service February 16, 2022
—— Description of the procurement:
- 1 medium voltage switchgear / 2 cast resin transformers 630 kVA;
- 1 pc. Modular UPS system 120 kVA with switch cabinet / UPS distribution;
- 1 pc low-voltage main distribution (3xLS field, 3x outgoing field, ZEP)
- 1 pc of energy data acquisition (meter cabinet, network analyzers, meters);
- 17 St. UV (AV network / UPS network);
- approx. 75 m busbar factory hall / 2 pc. Busbar connection NSHV transformer;
- approx. 1,350 m of cable trays and risers (E0 / E30);
- approx. 2,000 m of installation systems (BR / LF ducts, installation pipes, etc.);
- approx. 400 m underground sewer systems;
- approx. 1,000 installation devices (sockets, etc.);
- 1 pc KNX installation bus system (sun protection / general areas / central);
- 2 pcs SHE centers and operation (without drives);
- approx. 300 fire and acoustic barriers;
- approx. 720 lighting fixtures;
- 1 central battery system approx. 225 safety lights;
- 1 pc lightning protection system approx. 560 m air-termination lines and Interception rods;
- 1 pc of earthing and equipotential bonding for the entire building;
- 1 pc intercom (main entrance / barrier system);
- 1 pc. Handicapped emergency call system;
- 1 pc. BOS building radio system with control panel at the gate;
- 1 pc fire alarm system full protection with approx. 325 detectors, 5 RAS systems, acoustic alarm and integration in best. Central ring;
- 1 burglar alarm system for doors / windows on the ground floor;
- 1 pc video surveillance system outside;
- 1 hour access control approx. 15 online readers and central technology;
- 1 pc. Cabling (EDP) approx. 540 connections;
- Line systems high voltage (E0 / E30) / low current / media technology / outside;
- fiber optic connections components;
- outdoor lighting;
- barrier system ".