General renovation Bertleinschule Lauf an der Pegnitz construction phase 1b — builder work.
— make 38 m
— close 18 m
— make 5 m
— 9 crash bars made of HEB/HEA 160 to 180,
— 50 m
— 60 pcs core holes d=25 cm, wall thickness up to 70 cm,
— make and re-close 90 m wall slots,
— 90 pcs. ceiling breakthroughs 30-400 cm
— break 110 m
— 280 m
Expected non-binding execution:
Beginning November 2021 End: March 2022.