Flooring work 1_BA
Brief description of the measure:
On the site of IGS Lindenfeld, a 3-storey extension for a primary school is to be built next to the existing main building. The construction project will be carried out in 2 construction phases. The service described here concerns the 1st construction phase.
Further descriptions: see bill of quantities
Execution times:
Technical clarification, sample: within 4 weeks after placing the order
Flooring work: 18.03. - 05.04.2024
Main positions
Linoleum flooring d = 2,5mm 1.430qm
Linoleum sports flooring d = 3mm 150sqm
Linoleum dissipative 10sqm
Wooden skirting boards 1,110 running metres,
Control room raised floor 5sqm