Lot 1 - Rail, road and civil engineering
1. Track and road construction DVB AG
- remove approx. 6500 m2 of bituminous fastening
- remove approx. 410 m2 of track deck plates
- Remove approx. 120 m2 of small and mosaic pavement, temporarily store and reinstall
- remove approx. 200 m2 of concrete pavement
- remove approx. 180 m2 topsoil
- approx. 1,600 m3 excavated soil
- remove approx. 150 m of natural stone shelves
- remove approx. 630 m of single track (sleeper track with grooved rails)
- approx. 450 m of asphalt-covered GVP track
- remove approx. 485 m of frame track
- remove approx. 1,880 m3 of layers without binders
- remove approx. 500 m3 of concrete base layer
- remove 25 St track and rail drainage boxes, including approx. 900 m of drainage pipelines
- Remove 8 pcs shaft up to DN 1000 B
- 17 St Schachtneubau DN 1000 B
- approx. 800 m track drainage (multi-purpose pipe DN 200), produce
- 118 pcs rail drainage box, incl. approx. 250 m connecting pipes, manufacture
- supply and install approx. 250 m3 of floor
- produce approx. 2,200 m3 base course without binders
- produce approx. 400 m3 frost protection layer
- construct approx. 1,600 m of single track (grooved rails) on slab track with two-block sleepers embedded in concrete
- build approx. 15 m single track (grooved rails) on concrete sleepers (at building boundaries)
- approx. 5,600 m2 asphalt pavement closure in the track area, including rail chamber filling and joint casting
- 4 tram stops with raised cycle lane and with 170 m Combibord Dresden
as well as and produce guidance system for the blind
- supply and lay approx. 400 m2 of concrete paving
- approx. 500 m2 of natural stone paving and laying
- approx. 220 m high kerb made of natural stone supply and install
- Install 4 stop stele FIS 8 with integrated DFI and sound system
- Install 8 pcs 3-seater seating group
- Supply and install 6 pcs bicycle racks
- 4 St traffic signs deliver and set up
- civil engineering services for station equipment: construction of approx. 200 m trench and
Production of approx. 530 m cable conduit, various DN, 8 pcs cable ducts
- 2 St Construction of fence fields including sandstone bases and pillars (listed)
2. Road construction of the Radebeul Civil Engineering Office
- Remove approx. 6,500 m2 of bituminous road pavement
- Remove approx. 900 m2 of various natural stone pavement, temporarily store and reinstall
- approx. 680 m2 of various natural stone pavement and to the warehouse of the AG
- Remove approx. 2,500 m2 of concrete pavement
- remove approx. 150 m2 topsoil
- approx. 650 m³ ground excavation
- approx. 660 m granite wide boards and to the storage area of the AG
- remove approx. 900 m kerbs
- remove approx. 2,100 m3 of layers without binders
- Remove approx. 750 m3 of soil
- remove approx. 61 pcs of road drains, including approx. 410 m of connecting cables
- approx. 132 pcs of road drains, including approx. 1,400 m of connecting cables
- produce approx. 1,850 m of seepage line
- supply and install approx. 300 m3 of floor
- produce approx. 3,000 m3 frost protection layer
- produce approx. 700 m2 gravel base layer
- supply and install approx. 1,990 m high kerb made of natural stone
- supply and install approx. 660 m of concrete kerb
- approx. 1,950 m Bordrinne / pendulum gutter made of small pavement
- produce approx. 3,970 m2 of asphalt base courses for roadways
- produce approx. 3,970 m2 of asphalt binder and surface courses for roadways
- produce approx. 2,300 m of different joints
- supply and install approx. 45 m2 of processed large paving
- supply and install approx. 960 m2 of processed small paving
- supply and install approx. 650 m2 of small paving
- supply and install approx. 750 m2 of mosaic paving
- supply and install approx. 5,300 m2 of concrete block paving
- approx. 55 m2 of various guide plates for the blind and laying
- 90 St traffic signs deliver and erect
- Supply and install 22 pcs bicycle racks
- Supply and install 7 benches
- 9 St plant troughs supply and installation
- 8 St tree plantings
- Civil engineering services for light-signalling systems:
Production of approx. 970 m trench and production of approx. 1,900 m cable conduit,
various DN, 20 pcs cable ducts
- 50 m2 planting of ground cover
- create and maintain approx. 750 m2 of green areas
- approx. 10 m production of natural stone wall
- Vibration and vibration measurements
- approx. 180 m2 scaffolding work, 45 m2 roofing work (beaver tail), plastering work, 130 m2 painting work, carpentry work for 4 windows for renovation transformer house (listed building)
3. Services on systems of WAB - R+C Public lighting:
- Civil engineering services for public lighting:
Production of approx. 2,600 m trench and production of approx. 700 m cable conduit
4. Services for plants of WAB - R+C Trinkwasser:
- Earthworks for the construction of new drinking water pipes up to approx. 3.00 m deep / approx. 715 m trench DN 150 GGG/PE, approx. 115 m DN 300 GGG, approx. 85 m Installation DN 100 GGG of which approx. 60 m in thermowell DN 300/500 St
- Road demolition/road restoration outside building boundaries Road construction in the pipe trench area
- Restoration of prov. ceiling or prov. pipe trench backfilling in total. Construction stage
- 26 house connections replace / reconnect / extend
5. Services on WAB - Kanalbau installations:
- 822 m canal construction, laying depth up to approx. 5.0 m, of which:24 m DN 600 pcs, 220 m DN 500 pcs, 400 m DN 400 pcs,, 178 m DN 300 pcs
- 20 precast shafts DN 1000 to DN 2000 and rectangular, partly with masonry lower part
- 3 Sonderbauwerke
- 300 m2 beam shoring for special structures, excavation pit depth ~ 5.5 m
- 7000 m2 frame-guided slide rail shoring (two-stage), excavation pit depth ~ 3.0 - 5.0 m
- Replacement of new property drainage pipes
6. Services for SachsenNetze i.A.SWE installations
- Civil engineering services for SachsenNetze - Gas: construction of approx. 1,500 m trench,
ca. 1.400 m Rohrausbau
- Civil engineering services for SachsenNetze - NS/MS: Production of approx. 2,410 m cable trench,
Production of approx. 260 m cable conduit (various DN), approx. 900 m dismantling trench