Viktoriastift Clinic, Cecilienhöhe 3, 55543 Bad Kreuznach: Restructuring of house 10, complete renovation of the historic building (built in 1913) with partly Renewal of roof areas. Operation is discontinued during the construction phase.
It involves the construction of an access bridge as part of the renovation of a children's and adolescent hospital.
Here: Earthwork, reinforced concrete and masonry work for the production of foundation structures
ordnance clearance service/ investigation site
Protective fence position: 70 m
Demolition of natural stone wall 12 m³
Removal topsoil: 11 m³
Earth excavation Z1.1 100 m³
Production of microdrill pits (l= 5.00m): 8 pcs.
Construction foundation reinforced concrete: 14 m³
Backfill foundation: 70 m³
Formwork: 83 m²
Quarry stone masonry complements 1.5 m³