Description:
Civil engineering work BA2 interconnection line Voerde-Friedrichsfeld

The Lower Rhine district heating system is expanding its district heating network in Voerde. In this context, the district heating networks of Voerde-Stadt and Voerde-Friedrichsfeld are to be connected. The network connection will be established over a total distance of approx. 4,700 m in two sections. The district heating pipeline must be laid in DN 250/450 (reinforced once) and is accompanied by a DN 100 plastic cable protection pipe. The first section will be approximately 2,200 m long and the second section will be approximately 2,500 m long. The section described here is the second and is referred to below as BA II.

The start of BAII will begin in the Kiwitt industrial park at the border branch, where the BAI and BAII will be merged.

The further route is planned through the industrial park, along the Heideweg, partly in the park strip or sidewalk. At the end of the Heideweg, the line is moved further to the right into Am Industriepark on the right-hand side to the B8 (Hindenburgstr.).

In front of the traffic light, the Am Industriepark road is crossed by steel protection pipe pressures DN 600 and DN 150 (for control cables) and the product pipe (250/450) is drawn in. The further course is planned along the B8 (Hindenburgstr.) on the left to Heidestr.

On Heidestr., the line splits in two directions, on DN 250/450, via the B8 (Hindenburgstr.) into Heidestr., and on the other, further along the B8 (Hindenburgstr.) Direction, in DN 125/250 Green Way.

For the direction towards the heather, the B8 (Hindenburgstr.) is again to be pressed through with a DN 600 steel protective tube, into which the product tube is subsequently drawn in. On the eastern side of the B8 (Hindenburgstr.), the district heating pipeline will be relocated for another 80m to Heidestr., and connected to the existing pipe behind house no. 132.

The second direction is continued into the land of the residential building Dinslaken up to the Green Way. The district heating line is connected to the existing line on the Green Way.

The Lower Rhine district heating system is expanding its district heating network in Voerde. In this context, the district heating networks of Voerde-Stadt and Voerde-Friedrichsfeld are to be connected. The network connection will be established over a total distance of approx. 4,700 m in two sections. The district heating pipeline must be laid in DN 250/450 (reinforced once) and is accompanied by a DN 100 plastic cable protection pipe. The first section will be approximately 2,200 m long and the second section will be approximately 2,500 m long. The section described here is the second and is referred to below as BA II.

The start of BAII will begin in the Kiwitt industrial park at the border branch, where the BAI and BAII will be merged.

The further route is planned through the industrial park, along the Heideweg, partly in the park strip or sidewalk. At the end of the Heideweg, the line is moved further to the right into Am Industriepark on the right-hand side to the B8 (Hindenburgstr.).

In front of the traffic light, the Am Industriepark road is crossed by steel protection pipe pressures DN 600 and DN 150 (for control cables) and the product pipe (250/450) is drawn in. The further course is planned along the B8 (Hindenburgstr.) on the left to Heidestr.

On Heidestr., the line splits in two directions, on DN 250/450, via the B8 (Hindenburgstr.) into Heidestr., and on the other, further along the B8 (Hindenburgstr.) Direction, in DN 125/250 Green Way.

For the direction towards the heather, the B8 (Hindenburgstr.) is again to be pressed through with a DN 600 steel protective tube, into which the product tube is subsequently drawn in. On the eastern side of the B8 (Hindenburgstr.), the district heating pipeline will be relocated for another 80m to Heidestr., and connected to the existing pipe behind house no. 132.

The second direction is continued into the land of the residential building Dinslaken up to the Green Way. The district heating line is connected to the existing line on the Green Way.