Construction of four 6-storey residential buildings with 10 apartments each with a total living area of approx. 3 400 m 2
Painting walls
- approx. 1 250 m 2 Reinforced concrete walls: filling, sanding, roughing / painting fleece, disperse paint painting
- about 2 780 m 2 Drywall: Rough, Disperse paint
- About 1 400 m 2 Sand-lime brickwork with lime-cement plaster: filling, sanding, roughing / painting fleece, disperse paint painting
- about 250 m 2 Sand-lime brick Exposed masonry: silicate paint
- About 100 m 2 Exposed concrete: silicate paint
Painting works ceilings
- about 340 m 2 Plasterboard ceilings: painter fleece, dispersion paint
- About 1 500 m 2 Concrete surfaces: painter fleece, disperse paint
floor coating
- about 290 m 2 2-component epoxy sealant
Flooring work
- About 1 550 m 2 PVC flooring