Lot 44.1 sanitary installation.
- approx. 500 m sewage pipes up to DN 125,
- approx. 70 m rainwater pipes up to DN 125,
- approx. 1,200 m drinking water pipes up to DN 40,
- approx. 50 drinking water pipe fittings up to DN 40,
- 29 toilet facilities,
- 18 urinals,
- 35 washbasin systems,
- 4 pouring systems,
- 6 workroom basin systems,
- approx. 100 m gas pipe up to DN 40.