Shredding, moving, pushing and composting of lignified green waste, transports between the individual green waste collection points and composting plants and the acceptance of lignified green waste.
1. Shredding/chopping of untreated green waste at green waste collection points and complete takeover of the shredded material/wood chips at the source (full disposal) (25,000 m³/a).
2. Shredding/chopping of untreated green waste on composting plants (70,000 m³/a).
3. Production and acceptance of thermally recyclable material on composting plants (35,000 m³/a).
4. Relocation of the shredded material (47,000 m³/a).
5. Sieving of ready-made compost (10,000 m³/a) including placing on panel rents and taking over oversize (8,000 m³/a).
6.1 Transport of untreated green waste on a volume basis (8,000 m³ * 8 km/a) 6.2 Alternatively, transport of untreated green waste on a volume basis (5,000 m³ * 8 km/a) and partial removal of untreated green waste at the green waste collection points (3,000 m³/a) 6.3 Transport of untreated green waste on a weight basis (800 t x 14 km/a) 6.4 Transport of shredded material (16,000 m³ * 13 km/a) 6.5 Transport of compost (4,000 m³ * 13 km/a) 7. Pushing together green waste (135/a).
8. Orchards: Shredding/chopping of tree and shrub clippings from orchards and total takeover of the shredded material/wood chips at the point of origin (full disposal) (7,500 m³/a).