The renovation of the indoor shooting range in Charlottenburger Chaussee in Berlin is being carried out out of functional and technical necessity. The necessary expansion of the space program is based on the ceiling of the shooting range in the basement. The indoor shooting range is equipped with 18/1, 18/2 and 18/3 shooting lanes. The shooting range 18/3, in the basement, undergoes only minor renovation work. Before the actual renovation work begins, the building is completely freed from harmful substances. For the most part, this is done as an early measure.
The service component is demolition work, including a small proportion of pollutant remediation, foundations, concrete work made of in-situ concrete and masonry work. Remediation of pollutants: Partitioning approx. 120 m2, dismantling of WHO fibres approx. 150 m2, dismantling of pipelines containing asbestos approx. 30 m, dismantling of fire dampers containing asbestos approx. 56 pieces, dismantling of fire doors containing asbestos approx. 7 pieces, dismantling of flange gaskets containing asbestos approx. 200 pieces, disposal and transport of asbestos approx. 4 t, disposal and transport of asbestos cement approx. 0.5 t, disposal and transport of WHO fibres approx. 0.5 t, disposal and transport of waste wood approx. 2.5 t, Dismantling: dismantling and disposing of screed approx. 150 t, dismantling and disposing of concrete approx. 300 t, dismantling and disposing of tiles approx. 20 t, dismantling and disposing of sanitary porcelain approx. 0.5 t, dismantling and disposing of glass approx. 5 t, dismantling and disposing of bitumen approx. 1 t, dismantling and disposing of steel approx. 50 t, dismantling and disposing of metal approx. 50 t, Dismantling insulation dispose of approx. 1 t, dismantling and disposing of gypsum approx. 5 t, dismantling and disposing of wood approx. 20 t, dismantling and disposing of plastic approx. 50 t, foundations: earthworks approx. 250 m2, planning approx. 120 m2, perimeter insulation approx. 120 m2, formwork strip foundation approx. 100 m2, in-situ concrete cleanliness layer approx. 120 m2, reinforcing steel approx. 2 t, in-situ concrete floor slab approx. 40 m3, Reinforcing steel approx. 7 t, shell of the shooting hall: steel components beam HEM 450 approx. 10.70 m, steel components beam HEM 300 approx. 10.70 m, steel components beam HEM 320 approx. 11.62 m, steel plate beam 1,2,3 approx. 68 m2, in-situ concrete approx. 10.5 m3, reinforcement connection approx. 25 m, substructure for modular construction: steel components beam HEM 260 approx. 2.8 m, steel components beam HEM 260 approx. 14 m, Steel components beam HEM 550 approx. 230 m, plaster work: interior plaster two-layer, interior wall lime cement plaster approx. 500 m2.