Works for complete or part construction and civil engineering work | Tenderlake

Works for complete or part construction and civil engineering work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 December 2021
Closing Date:
20 January 2022
Location(s):
PL22A Katowicki (PL Poland/POLSKA)
Description:
Ordering the rainwater drainage system in the catchment area of the View estate, Dunikowskiego Street and Stęślickiego Street in Katowice — Stage II

The subject of this order is “Ordering the rainwater drainage system in the catchment area of the View estate, Dunikowskiego Street and Stęślickiego Street in Katowice — Stage II”.

The scope of the order includes the construction of 1110m network, including:

- 1003,6m rainwater drainage network in the range of diameters DN315-2000mm including 3 retention channels with retention capacity:

• retention channel KR 1 with diameter DN2000mm and length L=100,2m and retention capacity V=315,0m3,

• KR2 retention channel with diameter DN1500mm and length L=325.2m and retention capacity V=575,0m3,

• KR3 retention channel with diameter DN1500mm and length L=284.0m and retention capacity V=501,0m3

together with network facilities, i.e. reinforced concrete inspection wells with diameter DN3200-1200mm and eccentric wells PEHD DN1200mm

- 113,3m reconstruction of the existing DN250mm gas pipeline together with fittings,

- restoration of pavement in the lane of planned construction and assembly works

1. The subject of this order is “Ordering the rainwater drainage system in the catchment area of the View estate, Dunikowskiego Street and Stęślickiego Street in Katowice — Stage II”.

The scope of the order includes the construction of 1110m network, including:

- 1003,6m rainwater drainage network in the range of diameters DN315-2000mm including 3 retention channels with retention capacity:

• retention channel KR 1 with diameter DN2000mm and length L=100,2m and retention capacity V=315,0m3,

• KR2 retention channel with diameter DN1500mm and length L=325.2m and retention capacity V=575,0m3,

• KR3 retention channel with diameter DN1500mm and length L=284.0m and retention capacity V=501,0m3

together with network facilities, i.e. reinforced concrete inspection wells with diameter DN3200-1200mm and eccentric wells PEHD DN1200mm

- 113,3m reconstruction of the existing DN250mm gas pipeline together with fittings,

- restoration of pavement in the lane of planned construction and assembly works

2. Determination of the order according to the Common Procurement Dictionary (CPV):

Main item:

45000000 — 7 Construction work

Additional items:

45100000 — 8 Preparation of the site for construction.

45200000 — 9 Works for the erection of complete construction structures or parts thereof and works in the field of civil and water engineering

45110000 — 1 Construction demolition and demolition work, earthworks

45230000 — 8 Construction work in the field of construction of pipelines, communication and electricity lines, highways, roads, airports and railways; land leveling

45111000 — 8 Demolishing works, earthworks

45231000 — 5 Construction work for pipelines, transport lines and power lines

45233000 — 9 Works for the construction, foundation and execution of road surfaces

3. For a detailed description of the item of the order, see Annexes 10A — 10K to SWZ.

4. Additional requirements for the subject of the contract:

1) The Contractor will incur the costs of obtaining all permits, use of the site during the works, administrative costs, maintenance of the cleanliness of the construction site and the adjacent site, including during the winter, etc. and incur the costs of adapting to the other requirements (additional requirements can be found in Annex 7 to SWZ).

2) All components and materials used by the Contractor must be authorised for use in the area of mining damage.

3) The Contractor in his own right and at his expense will update and agree on the design of the organization of the movement.

4) The Contractor shall, at the request of the Contracting Authority, submit a card for the transfer of waste for disposal, including debris and earth from the excavations, or present another document for their reuse or recycling.

The costs of the activities listed above shall be considered to be measured by the contractor,

included in the offer price and not subject to separate payment.

5. The Contracting Authority shall require employment by the contractor or subcontractor on the basis of the employment relationship of persons performing the following performance of the contract:

a) Excavation works

b) Installation work

c) Reconstitution robots

d) Operation of construction equipment

The requirements for the employment of persons performing the abovementioned activities are set out in Annex 4 to SWZ, a model contract.

Download full details as .pdf
The Buyer:
Katowicka Infrastruktura Wodociągowo-Kanalizacyjna Sp. z o.o.
CPV Code(s):
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45111000 - Demolition, site preparation and clearance work
45200000 - Works for complete or part construction and civil engineering work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45231000 - Construction work for pipelines, communication and power lines
45233000 - Construction, foundation and surface works for highways, roads