For the flood protection of the municipality Baar-Ebenhausen are in the construction section 2, lot 5 in the section between the Geisenfelder road and the Stockaustraße on the right and left Paarufer 2 flood protection walls (total length about 720 m) with parallel facilities for internal drainage (drainage and collector line with Shafts) to create. In addition, in the microtunneling process, the connection of the internal drainage to the right of the pair to an existing DN 3200 manhole at the Baar-Ost pumping station is to be carried out. Other services include raising with additional shell and supplementing existing walls at the parcel boundary, the production of the bank protection with water blocks with area-wise reconstruction of the PaBeschung, the construction-time laying of divisions in the action area, demolition, black ceiling works and fence work.
Essentially, the following work has to be carried out:
- clearing the site including clearing, ordnance clearance,
- Construction of cervical walls (9 000 m³ earthworks, 860 m³ concrete, 105 t steel), construction of internal drainage with shafts (272 m concrete pipe DN 300 and DN 400, 442 m concrete pipe DN 500, 30 concrete shafts, 730 m seepage pipe DN 200 up to 250, 49 PE-HD shafts, 1 200 m³ earthworks, 2 200 m
- Microtunneling:
- 1 tunneling line (L tot 40 m) with reinforced concrete pipes DN 700 from a manhole to be created DN 3200 to an existing manhole DN 3200 with all accompanying work and associated statics.
- Slope stabilization and bank construction:
- Installation gravel, scooping, pebbles 2 400 t,
- Asphalt demolition, asphalting 730 m
- accompanying work such as operation of drainage for wall construction and pipeline construction, services to divisions, Einsaht, surveying, disposal soil 5 200 t, disposal topsoil about 1 150 m³, etc.